お客様事例-4809

Multi-axis Fine Boring Machining Center

Customer case study-4809

Machining may change accuracy by performing auto tool change.
Therefore, for workpieces that require high accuracy, in-line system measurement is necessary after final finishing, which increases the cycle time of the production line.
With Sakurai’s multi-axis fine boring machining centers, machining accuracy can be achieved in a single operation because there is no automatic tool change.
Machining accuracy can be stabilized at a high precision, thus simplifying the inspection process in the production line as mentioned above.
In addition, cycle time can be shortened by simultaneously machining both sides of the workpiece with the multi-axis head.

Contents
Target workCrankcase
Cycle time52 sec.
Standard delivery time
6 months after order receipt
  About Listing Information

The product images shown are only examples. When considering upgrading existing equipment, there are no restrictions on the manufacturer or specifications of the robot used.


All of our products are proposed based on the customer’s requests after hearing the details of the customer’s production line layout, capacity, product outline, and personnel allocation.

Related Articles

  1. Double-sided cutting machine for connecting rods

  2. ミッションケース向け対向2ヘッド 多軸専用加工機

  3. 専用加工機トランスファー ライン

  4. シリンダーヘッド加工用44頭 最大22軸の多軸ヘッドチェンジングマシン

  5. Multi-axis head changing machine : CUBIC

  6. Our technology and features20Multi-axis head to consolidate processes

  7. Pipe press fitting equipment

  8. #50横型ガンドリル対応マシニングセンター

  9. B-Trim500 CYL-BLOCKバリ取り