Customer case study-4344
Simultaneous machining of large construction equipment parts (side frames) from 3 directions (vertical and horizontal machining) with R/L set attachment. Workpiece length: 3 to 4 m, Workpiece weight: 3 to 4 t, Machine length: 20 m Machining can be completed 3 to 4 times faster than with conventional single machining, faster than with 3 5-face machines.
Contents | |
---|---|
Target work | Side frame |
Cycle time | 20~45 min. |
Standard delivery time |
---|
10 months after order receipt |
The product images shown are only examples. When considering upgrading existing equipment, there are no restrictions on the manufacturer or specifications of the robot used.
All of our products are proposed based on the customer’s requests after hearing the details of the customer’s production line layout, capacity, product outline, and personnel allocation.